Home - Return to Previous Page
Additional Images

Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over Dynomite Diesel

30515887
Fits 1999-2003 Powerstroke Diesel 7.3 Liter
Availability: This item is not in stock in our warehouse but may be available to drop ship. Call us for availability and lead time at 888-290-3820.
Was: $3,920.87
Sale: $3,724.83

Customize Your Item

- Choose Core Option -
 * required
Qty:
Free Ground Shipping

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that's been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.

Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Product Videos

https://www.youtube.com/watch?v=Dpq0FcyM34w

warranty

1 Year

Details

  • 30515887
  • GHJG-DDP AE-2
  • 671875112077
  • Dynomite Diesel
  • This item is not in stock in our warehouse but may be available to drop ship. Call us for availability and lead time at 888-290-3820.
  • New

Shipping Information

  • Item Requires Shipping
  • 17.0 lbs.
  • W17.0000” x H9.0000” x L12.0000”
  • Free Ground Shipping

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.