Home - Return to Previous Page
Click on image to zoom

Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel

30515891
Fits 1999-2003 Powerstroke Diesel 7.3 Liter
Availability: This item is not in stock in our warehouse but may be available to drop ship. Call us for availability and lead time at 888-290-3820.
Was: $412.00
Sale: $391.40

Customize Your Item

- Choose Core Option -
 * required
Qty:
Free Ground Shipping

Description

Dynomite Diesel 7.3L #8 Long Lead Injector for 1999-2003 Powerstroke

SKU: DDP AENEW

Ford 1999-2003 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines, which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with, or do not want to take the time to check, then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Product Videos

https://www.youtube.com/watch?v=Dpq0FcyM34w

warranty

1 Year

Details

  • 30515891
  • GHJG-DDP AENEW
  • 671875112039
  • Dynomite Diesel
  • This item is not in stock in our warehouse but may be available to drop ship. Call us for availability and lead time at 888-290-3820.
  • New

Shipping Information

  • Item Requires Shipping
  • 3.5 lbs.
  • W3.5000” x H3.5000” x L10.5000”
  • Free Ground Shipping

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.